
Full Bathroom Remodel
Full gut remodel in a 1926 Worcester two-family: cast-iron waste replaced with PVC, PEX supply, Schluter Kerdi shower, 12x24 porcelain floor. Lead-safe containment throughout.

Rip the tub, build a real shower
Full tub-to-shower conversions across Massachusetts. We pull the permit, rebuild framing, waterproof with Schluter, tile to ceiling, and hang frameless glass.
On-site quote, firm number, no high-pressure sales. Response within 1 business day.
Licensed & Insured
MA Home & MA
NKBA Certified
Certified Bath Designer
4.9 / 5.0
214+ reviews
1180+ Bathrooms
Since 2013
Real conversions, no 'liner' gimmicks
A proper tub-to-shower conversion is a small remodel, not a cover-up. We don't install 'bath fitters' over existing fiberglass. We gut the tub surround to the studs, evaluate framing, add blocking for valves and glass, waterproof with Schluter, build a proper shower pan, and tile from floor to ceiling.
Most Massachusetts tub-to-shower conversions involve pulling a 70-pound cast iron tub, rerouting the drain and overflow, adjusting stud spacing for a modern valve, and sometimes sistering joists because the old tub mass hid deflection. These are the steps a legitimate conversion includes.
Massachusetts requires a permit for this work because it's plumbing and structural. We pull it, schedule the inspection, and hand you a clean paper trail. You'll own a properly permitted bathroom worth more at resale.
See all of our Massachusetts bathroom renovation services — from full gut remodels to accessible baths, tub-to-shower conversions, and master suite builds across Massachusetts.

What's included
Our Process
No mystery. No surprise delays. Here's the exact sequence.
We walk the bathroom, measure, identify the tub drain, assess framing access, quote firmly. Permit plan discussed.
Pull the tub, strip to studs, inspect framing. Add valve blocking, glass blocking, drain reroute if needed. Plumbing rough.
Schluter pan set, Kerdi on walls, pre-formed corners. Tile dry-fit, install, grout. Schluter-Jolly edges at terminations.
Glass templated on cured tile. Valve trim, rainhead, handheld. Final leak test. Grout seal. Walkthrough with you.
Materials We Trust
We only install systems we can stand behind for twenty years. No brand bait-and-switch mid-job.

Schluter Kerdi-Board
The go-to for tub-to-shower conversions. Waterproof and substrate in one panel. Handles framing out of plumb common in older Massachusetts baths.
Schluter Kerdi-Shower-ST pan
Pre-sloped foam pan with integrated drain flange. Replaces old-school mud-set tub framing.
PVC drain reroute
Tub drains are 1.5-inch. Shower drains need 2-inch. We reroute to modern PVC within code.
Thermostatic valves: Kohler, TOTO, Delta
Pre-set temperature valves prevent scald. Long-term availability of replacement cartridges.
Worth knowing first
If it's your only tub and you have small children or plan to sell in 2–3 years, keep a tub somewhere in the house. We often recommend converting a secondary bath and keeping a tub in the master or hall.
A 1950s–1970s Massachusetts tub often weighs 350 pounds. We break them into pieces in the room to remove without damaging framing or subfloor. Occasionally we've found framing that couldn't support a new soaking tub anyway — this inspection is part of the demo day.
Most old tub valves sit at 24" high — too low for a proper shower. We move the valve to 48" and add the showerhead rough at 80" while the wall is open. Zero cost to do it now; expensive later.
An un-permitted conversion can't be disclosed cleanly when you sell. Appraisers discount non-permitted work. We always pull the permit; the math works.
Live Job Log
Real tub to shower projects finished in Massachusetts over the last few months.

Full Bathroom Remodel
Full gut remodel in a 1926 Worcester two-family: cast-iron waste replaced with PVC, PEX supply, Schluter Kerdi shower, 12x24 porcelain floor. Lead-safe containment throughout.

Tub to Shower Conversion
Tub-to-shower conversion in a Boston triple-decker: pulled cast-iron tub down three flights, rebuilt framing, Kerdi-Line linear drain, frameless glass.

Walk-In Shower Installation
Curbless walk-in shower in a Chelmsford ranch: zero-threshold pan, Kerdi-Board walls, bench seat, thermostatic valve, grab-bar blocking added.

Master Bathroom Renovation
Master bath remodel in a Lexington colonial: relocated supply for a freestanding tub, double quartz vanity, heated Ditra floor, Wellesley-style wainscot.

Full Bathroom Remodel
Hall bath gut in a Plymouth cape: rotted subfloor replaced, new rough-in, 24x48 large-format walls, building and plumbing permits pulled.

Accessible Bathroom Remodel
Accessible bath conversion in Andover: 36-inch doorway widened, curbless shower, fold-down bench, ADA grab bars, comfort-height toilet.

Shower Replacement
Shower replacement in a Springfield two-family: failed mud pan removed, Schluter Kerdi system, subway walls, mosaic floor, new mixing valve.

Bathtub Replacement
Bathtub replacement in a Reading colonial: cast-iron out, new alcove soaking tub, tiled surround, Schluter-Jolly edge profiles.
What homeowners say
We converted our tub to a curbless walk-in shower for my mother-in-law. Commonwealth Bath handled the Worcester County permit and everything was inspected clean. Grab bars where we asked, fold-down bench. Worth every dollar.
Tom D.
Framingham, MA · Tub to Shower
Tub to shower conversion in Lexington: permit pulled, framing rebuilt, Schluter Kerdi-Board, handheld + rainhead, bench seat.
Susan F.
Lexington, MA · Tub to Shower
Pulled the cast iron tub in our 1960s Worcester colonial. Rebuilt the framing, Kerdi-Line drain, large format porcelain. Beautiful and bulletproof.
Chris N.
Worcester, MA · Tub to Shower
Questions
Typically 10–14 days of construction plus a 7–14 day wait for frameless glass. Budget 3 weeks total before the shower is fully usable.
Yes, in both Massachusetts. It involves plumbing relocation and waterproofing work that inspectors want documented. We handle the permit and inspection.
Sometimes. We need a framed subfloor with joist access below (basement or crawlspace) to lower the drain. Slab-on-grade ranches usually need a small threshold or trench drain design.
We break it up in the room (controlled), wrap, and haul off. Sometimes we donate serviceable vintage tubs to architectural salvage.
No. A liner is a fiberglass-over-fiberglass cover. It leaves the waterproofing intact (often failing), and can trap moisture. We don't install liners. We rebuild properly.
Related services
Ready when you are
Free on-site estimate. Firm quote within 48 hours. No high pressure, ever.
1180+
Bathrooms Completed
4.9★
214 Google Reviews
1 day
Callback Window
On-site quote, firm number, no high-pressure sales. Response within 1 business day.