Shower renovation: new Schluter pan, rebuilt shower curb, mosaic floor, subway walls, brushed nickel trim kit.
Greg O.
Massachusetts · Shower Renovation

When only the shower needs to come out
Rip out the failing pan, rebuild with Schluter Kerdi, new valve, new tile, frameless glass. Most projects finish in 10–14 days.
On-site quote, firm number, no high-pressure sales. Response within 1 business day.
Licensed & Insured
Massachusetts HIC #211749
Lifetime Warranty
On our workmanship
5.0 / 5.0
24 homeowner reviews
520+ Projects
Since 2014
Shower-only projects
If your shower pan is leaking, the grout is crumbling, or the tile is dated — but the rest of your bathroom is fine — you don't need to gut the whole room. We do shower-only renovations regularly in Massachusetts.
It's a contained, 10–14 day project. Demo the existing shower to the studs, inspect framing, rebuild the pan with Schluter Kerdi-Shower-ST or a custom mud pan, waterproof the walls with Kerdi sheet or Kerdi-Board, install new valves, tile to the ceiling, and hang a new frameless glass enclosure.
Most of the shower renovations we do in Massachusetts are 20–30 year old fiberglass surrounds that failed at the pan-to-wall joint, or 1990s cultured-marble jobs that finally cracked. Both are past fixing. A proper rebuild is the right call.
It is also the moment to go further than a straight replacement. A luxury shower renovation usually means a bench and niche built into the tile, a rainhead with a handheld on a slide bar, a thermostatic valve, large-format or stone tile to the ceiling, and a frameless glass enclosure. The waterproofing underneath is the same either way.
See all of our Massachusetts bathroom renovation services — from full gut remodels to accessible baths, tub-to-shower conversions and master suite builds — for homeowners in Shrewsbury and the surrounding Central Massachusetts towns.

What's included
Our Process
No mystery. No surprise delays. Here's the exact sequence.
We walk the shower, identify the failure mode, talk about tile and fixture swaps, quote firmly.
Strip to studs. Inspect and repair framing rot. Add valve blocking. Drain cleanout.
Schluter pan, Kerdi walls. Tile layout, dry-fit, install, grout. Sealed and cured.
Glass measured and installed on cured tile. Fixture trim, final leak test, caulk.
Worth knowing first
Grout is the wear layer. The real waterproofing sits behind the tile, behind the backerboard. Regrouting a failing shower is a cosmetic fix on a structural problem. We always pull the tile and rebuild the waterproofing.
Shower leaks often rot the wall plate at the bottom of the stud wall. We open up the base wall on day one before quoting the framing repair. Our quote includes a realistic allowance for this.
If the drain location works for your new layout, we re-use the existing drain pipe and replace only the fitting. Saves a few hundred dollars of plumbing. If you're switching to a linear drain, we reroute.
20-year-old valves often have stuck cartridges and discontinued parts. We replace proactively during a shower reno. You don't want to open the wall again in two years.
What homeowners say
Shower renovation: new Schluter pan, rebuilt shower curb, mosaic floor, subway walls, brushed nickel trim kit.
Greg O.
Massachusetts · Shower Renovation
Shower renovation: full Kerdi waterproofing, Calacatta marble walls, linear drain, frameless glass, new valve.
Amy P.
Massachusetts · Shower Renovation
Rebuilt our failing cultured-marble shower with Kerdi-Board and big porcelain tiles. Zero leaks, perfect tile lines.
Joe R.
Massachusetts · Shower Renovation
Questions
10–14 days for build + 7–14 days for frameless glass. 3 weeks total for shower usability is typical.
Yes. Shower-only projects leave the rest of the bathroom alone. We tape off, contain dust, and work within the shower footprint.
If we're replacing the shower valve and waterproofing assembly, Massachusetts requires a permit. We pull it.
Common on older Massachusetts showers that have been leaking for years. Our contract includes a framing allowance. We show you the photos, explain the fix, document the cost.
Related services
Ready when you are
Free on-site estimate. Firm quote within 48 hours. No high pressure, ever.
520+
Projects Completed
5.0★
24 Homeowner Reviews
1 day
Callback Window
On-site quote, firm number, no high-pressure sales. Response within 1 business day.