2026 Massachusetts Cost Guide
Bathroom renovation cost in Massachusetts.
Typical ranges for Massachusetts bathroom projects, so you know roughly where yours lands. No bait-and-switch. Firm itemized quote in 48 hours after the walk.
Get Your Free Bathroom Estimate
On-site quote, firm number, no high-pressure sales. Response within 1 business day.
Licensed & Insured
Massachusetts HIC #211749
Lifetime Warranty
On our workmanship
5.0 / 5.0
24 homeowner reviews
520+ Projects
Since 2014
Project Cost Tiers
Six ranges. Every Massachusetts project fits one.
These are typical ranges, not fixed prices. The exact number depends on your layout, finish level, and what we find behind the walls, which is why every project gets an on-site walk before we quote.
Hall Bath Refresh
Typical range
$18,000 – $28,000
Typical duration: 3–4 weeks
Small-to-mid hall bath. Tub-in-place or shower-over-tub. Vanity replacement, tile floor, tub surround retile, toilet, fixtures, trim, paint.
- Full demo and disposal
- New Schluter Kerdi waterproofing in wet areas
- 12x24 porcelain tile floor
- Ceramic or porcelain tub surround
- New vanity with quartz top, undermount sink
- New toilet (1.28 gpf WaterSense)
- Mid-range Moen or Kohler trim kit
- Paint and finish carpentry
- Town permit filed and closed
Hall Bath Full Remodel
Typical range
$28,000 – $45,000
Typical duration: 4–5 weeks
Full gut hall bath. Plumbing rough-in updates, subfloor check, custom tile work, upgraded vanity, frameless glass shower option. The most common Massachusetts bathroom project.
- Complete gut to studs and subfloor
- New PEX supply and PVC drain rough-in
- Schluter Kerdi-Board or Ditra substrates
- Large-format tile (24x24, 12x24) or herringbone floor
- Custom tile shower with niche and bench
- Frameless or semi-frameless glass enclosure
- Floating or custom vanity
- Upgraded fixture package (Kohler, Delta, Grohe)
- LED mirror, exhaust fan with humidity sensor
- Lead-safe demo protocol (pre-1978 homes)
Tub-to-Shower Conversion
Typical range
$10,000 – $22,000
Typical duration: 2–3 weeks
Removing an old tub and building a proper walk-in shower in the same footprint. The #1 request from aging-in-place Massachusetts homeowners.
- Cast iron or fiberglass tub removal
- Framing rebuild where needed
- Schluter Kerdi-Line linear drain or center drain
- Full Kerdi waterproofing system
- 12x24 or subway tile walls
- Built-in bench seat or fold-down bench
- Thermostatic valve with handheld + rainhead option
- Frameless glass enclosure (or curbless curtain)
- Grab bar rough-in for future ADA
Master Bathroom Renovation
Typical range
$30,000 – $95,000+
Typical duration: 4–6 weeks
Full master suite bathroom. Freestanding tub, separate walk-in shower, double vanity, premium finishes. The flagship Massachusetts project.
- Complete gut + plumbing relocation
- Freestanding soaking tub (Kohler, MTI, Victoria + Albert)
- Curbless walk-in shower with Schluter Kerdi-Line drain
- Double vanity with quartz or marble top
- Heated porcelain floor (NuHeat or Ditra Heat)
- Floor-to-ceiling tile (porcelain or marble)
- Frameless glass enclosure
- Custom lighting plan (recessed, sconces, vanity)
- Humidity-sensor exhaust, smart mirror options
- Finish carpentry, wainscot, ceiling detail
Accessible / ADA Bathroom
Typical range
$15,000 – $48,000
Typical duration: 3–5 weeks
Aging-in-place or ADA-compliant bathroom. Curbless shower, grab bars, comfort-height toilet, wider doorways.
- Zero-threshold curbless shower
- Slip-resistant porcelain floor
- Blocking in walls for grab bars (reinforced)
- ADA-compliant grab bars (304 stainless)
- Comfort-height (17") toilet
- 36" door widening or pocket door retrofit
- Thermostatic anti-scald valve
- Handheld sprayer on slide bar
- Fold-down bench seat
Shower-Only Renovation
Typical range
$8,000 – $18,000
Typical duration: 2–3 weeks
Isolated shower rebuild. Usually when an older shower is leaking, mildewed, or the tile is failing.
- Demo of existing shower (walls, pan, door)
- Subfloor and framing check
- Full Schluter Kerdi waterproofing
- New tile (porcelain, ceramic, marble)
- Linear drain or center drain
- New thermostatic valve and trim
- Frameless glass or semi-frameless enclosure
- Niche and bench seat optional
All ranges are typical estimates for Massachusetts bathroom projects, not quotes. Actual pricing depends on scope, material selection, structural condition and permit fees. On-site estimate required for a firm quote.
What drives cost
Six variables that move the number.
Plumbing relocation
Moving a toilet, tub, or shower drain cuts into the subfloor and adds 1–3 days of rough-in labor, plus new waste and supply lines.
Tile choice
Herringbone marble takes twice as long to install as straight-lay 12x24 porcelain. Large-format (24x48) also slower. Labor is the multiplier.
Waterproofing method
Schluter Kerdi-Board costs more than Redgard but is built to last 40+ years. We use Schluter every time — it's included.
Fixture tier
Moen vs Kohler vs Grohe vs Dornbracht can typically swing the budget $1,500–$6,000. Your choice.
Structural surprises
Rotted studs, failed subfloor, knob-and-tube wiring, cast iron waste line cracks — we call these out in writing before any extra bill.
Permit and inspection
Each town sets its own permit fees. They are included in our quote as their own line, so you see exactly what they add.
Pricing FAQ
Questions homeowners ask before signing.
Because bathroom renovations have too many variables — square footage, plumbing relocation, tile selection, fixture budget, door widening, permits. Any contractor giving you a fixed number before walking the space is guessing. We walk your bathroom, scope it, and quote firmly in 48 hours — itemized line-by-line. What you see on our site are typical ranges for Massachusetts bathroom projects, not quotes.
Everything. Demo, disposal, framing, rough-in plumbing and electrical, all materials by brand and SKU, all labor, Schluter waterproofing system, tile install, fixtures, vanity, toilet, trim, paint, permit fees, inspection coordination, and final punch. The only line items not included are things we couldn't see (rotted studs, knob-and-tube electrical, cast iron waste line failures) — and those are called out in writing before any surprise bill shows up.
Ask at the estimate. You get the fixed written price first, so you know the full number, and then we can talk through how you plan to pay: cash, a home equity line or a loan you arrange yourself. See our financing page for the usual options.
Permit fees are included in our quote as their own line. Each town sets its own fee schedule, usually based on the value of the work, so the amount differs from Shrewsbury to Leominster. You see the exact figure on your quote, with no hidden line items.
Because we don't skip the waterproofing system. Schluter Kerdi-Board or Kerdi-Fabric typically adds about $1,200–$2,000 of material + labor compared to Redgard paint-on systems. That's the difference between a shower that leaks in 18 months and one that survives 40 years. You get what you pay for in wet-area construction.
Biggest cost drivers: (1) relocating plumbing — moving a toilet to a new wall means cutting the subfloor and re-running waste lines. (2) large-format or marble tile — installation labor is 2x vinyl or ceramic. (3) freestanding tubs — need rough-in relocation. (4) heated floor — adds materials + electrical. (5) frameless glass — custom measured after tile is in. (6) door widening for ADA — structural work, may need an engineer.
We discourage it, but it's your call. If a vanity arrives damaged, or a faucet doesn't fit, you eat the delay and the restock. We buy trade-direct from plumbing supply houses (often at lower net than big-box retail), so you rarely save much anyway. The risk isn't worth it.
Your contract sets out the deposit and each progress payment before any work starts, so payment tracks the work actually done. As a registered Massachusetts home improvement contractor, we cannot legally require more than a one-third deposit up front.
Ready when you are
Let's start your bathroom.
Free on-site estimate. Firm quote within 48 hours. No high pressure, ever.
520+
Projects Completed
5.0★
24 Homeowner Reviews
1 day
Callback Window
Get Your Free Bathroom Estimate
On-site quote, firm number, no high-pressure sales. Response within 1 business day.

