Master bath renovation with double vanity, freestanding tub and a frameless glass shower. Their tile specialist laid herringbone floor perfectly. Crew cleaned up every single day.
Priya S.
Massachusetts · Master Bath

The one you enjoy every morning
Full master bathroom renovations for Shrewsbury and the surrounding towns. Freestanding tubs, double vanities, heated porcelain floors, frameless-glass showers, tile to ceiling.
On-site quote, firm number, no high-pressure sales. Response within 1 business day.
Licensed & Insured
Massachusetts HIC #211749
Lifetime Warranty
On our workmanship
5.0 / 5.0
24 homeowner reviews
520+ Projects
Since 2014
Master bath specialists
A master bathroom is a twenty-year room. It should feel like a hotel you don't want to leave and run without a plumbing mystery for decades. That's a design question, a plumbing question, and a waterproofing question — we handle all three.
Design comes first. We lay out the room so the toilet, tub, shower and vanity sit in a sequence that works, then help you choose materials you actually want to live with.
Behind the tile we install modern plumbing (PEX supply, PVC drain), Schluter waterproofing on every wet surface, Ditra uncoupling membrane under the floor, and joist reinforcement where deflection calls for it. The luxurious finish lasts because the boring stuff underneath is right.
See all of our Massachusetts bathroom renovation services — from full gut remodels to accessible baths, tub-to-shower conversions and master suite builds — for homeowners in Shrewsbury and the surrounding Central Massachusetts towns.

What's included
Our Process
No mystery. No surprise delays. Here's the exact sequence.
We walk the bathroom, measure, and talk lifestyle and wish-list, then settle the layout, fixtures and materials with you before anything is ordered.
Tile samples, fixture showroom visits (if desired), quartz samples. We help edit choices to avoid 50-option paralysis.
Permit, demo, plumbing rough, framing, waterproof, tile, cabinets, glass, fixtures, paint, trim. Typically 4–6 weeks.
Inspection, punch list, final sealing, final walkthrough. One crew from day one. Daily photo updates the whole way.
Materials We Trust
We only install systems we can stand behind for twenty years. No brand bait-and-switch mid-job.

Schluter Kerdi + Kerdi-Board
Shower and tub-deck waterproofing. Industry standard.
Schluter Ditra-Heat
Uncoupling membrane + integrated electric floor heating. Comfortable floors without the cost of a full hydronic system.
Freestanding tubs: Kohler Memoirs, TOTO Neorest, Victoria + Albert
Cast iron, acrylic, or volcanic limestone. We level and secure every tub properly — no wobble.
Floor tile: porcelain or marble
Large-format porcelain (24x48) or natural stone. Natural stone gets sealed and sealed again.
Quartz vanity: Cambria, Silestone, Caesarstone, MSI Q
Non-porous, heat and stain resistant, lifetime look.
Fixtures: Kohler, TOTO, Brizo, Waterworks
All-metal construction, parts-for-life brands. No plastic valve bodies.
Worth knowing first
A filled cast-iron freestanding tub with a person in it is 800+ pounds in one spot. We verify joist capacity before ordering. Sometimes the joist bay needs a sister. Sometimes a blocked bay. We check first.
Most Massachusetts master baths were built with a single vanity. Going to a double means teeing off the existing supply and adding a drain branch — we permit it and run it properly. Not a two-hour job.
Ditra-Heat goes under the tile. Adding it after tile is already down is a full floor tear-out. If you're remodeling, we always price both options and let you decide with full information.
Adding tile from standard 48" to full ceiling roughly doubles the tile labor on the walls. Worth it on master baths. Feels custom; not an upcharge we recommend on every bath.
What homeowners say
Master bath renovation with double vanity, freestanding tub and a frameless glass shower. Their tile specialist laid herringbone floor perfectly. Crew cleaned up every single day.
Priya S.
Massachusetts · Master Bath
Beautiful craftsmanship. They redid the master bath including plumbing rough-in relocation for the freestanding tub. No corners cut on the waterproofing.
Rachel T.
Massachusetts · Master Bath
Master bathroom remodel: freestanding soaking tub, separate shower, double vanity, heated porcelain floor. Our design is gorgeous.
Evan L.
Massachusetts · Master Bath
Questions
4–6 weeks for a standard master with plumbing relocation. 6–8 weeks if we're reconfiguring walls, adding square footage, or doing custom stone tile.
Sometimes, by taking closet space or reworking adjacent walls. We handle the architectural drawings for permit and engineering sign-off where structural.
Both. Design and material selection is part of every master project, and we are happy to build from a plan by your own interior designer or architect.
Ask us at the estimate. A steam shower needs full-ceiling waterproofing and a sealed enclosure, and a sauna is a separate build, so both depend on the space you have.
Related services
Ready when you are
Free on-site estimate. Firm quote within 48 hours. No high pressure, ever.
520+
Projects Completed
5.0★
24 Homeowner Reviews
1 day
Callback Window
On-site quote, firm number, no high-pressure sales. Response within 1 business day.