Commonwealth Bath Co.
Full Bathroom Remodel in Massachusetts

Full gut to final walkthrough

Full Bathroom Remodel in Massachusetts

Down-to-the-studs bathroom renovation for Shrewsbury and the surrounding towns. New plumbing, new layout, Schluter waterproofing, firm quote, one dedicated crew.

Licensed in Massachusetts Lifetime workmanship warranty 5.0★ / 24 reviews Mon–Fri 7–6, Sat 8–2

Get Your Free Bathroom Estimate

On-site quote, firm number, no high-pressure sales. Response within 1 business day.

No spam. No high pressure. We call once, answer your questions, schedule the on-site if you want.

Licensed & Insured

Massachusetts HIC #211749

Lifetime Warranty

On our workmanship

5.0 / 5.0

24 homeowner reviews

520+ Projects

Since 2014

A proper full remodel

Gut it properly. Build it once. Walk away clean.

A full bathroom remodel isn't a cosmetic refresh. It's a demolition, a new plumbing rough-in, new framing as needed, waterproofing, tile, fixtures, and trim — all sequenced so the finish work actually lasts. Done right on a Massachusetts hall bath, a full remodel takes 3–4 weeks and outlives its installers.

Most Massachusetts bathrooms we remodel were built in the 1950s–1990s. Cast iron drains, galvanized supply lines, cement-board-behind-tile with no real waterproofing. We strip all of that out, replace drain stacks with PVC, supply with PEX, waterproof with Schluter Kerdi or Kerdi-Board, and rebuild the room from the subfloor up.

We don't pack three projects and run between them. One Commonwealth Bath crew lives in your house from demo day to final walkthrough. Your project manager texts photo updates every evening. Firm number in the contract — no change-order theater.

See all of our Massachusetts bathroom renovation services — from full gut remodels to accessible baths, tub-to-shower conversions and master suite builds — for homeowners in Shrewsbury and the surrounding Central Massachusetts towns.

Full Bathroom Remodel in Massachusetts

What's included

Every bathroom remodel project includes:

  • On-site measurement and design consultation
  • Town permit pulled and managed
  • Full demo, debris haul-off, dust containment
  • New PVC drain stack + PEX supply lines
  • Schluter Kerdi or Kerdi-Board waterproofing
  • Schluter Ditra underlayment on floor
  • Subfloor/joist reinforcement as needed
  • New venting, GFCI outlets, bath fan

Our Process

How the project actually runs.

No mystery. No surprise delays. Here's the exact sequence.

01

On-site walk

A project manager walks your bathroom, measures, reviews layout options, talks scope and tile preferences.

02

Firm quote

Itemized, firm, 48-hour turnaround. Every line item, every material brand, every labor cost spelled out.

03

Build week

Permit pulled, demo day scheduled, one crew moves in. Daily photo updates. Floor protection every day.

04

Final walk

Inspection signed off, punch list completed, grout sealed, caulk cured. We don't leave until the last tile is perfect.

Materials We Trust

The brands and systems we spec.

We only install systems we can stand behind for twenty years. No brand bait-and-switch mid-job.

Premium bathroom materials

Schluter-Systems Kerdi / Kerdi-Board

Sheet-membrane waterproofing for walls and pan. Industry-standard life-of-bathroom waterproof layer.

Schluter Ditra

Uncoupling membrane under every tile floor. Stops subfloor movement from cracking grout or tile.

Kohler, TOTO, Delta, Moen

Fixtures and valves with parts availability and solid warranty. No big-box mystery brands.

Porcelain tile: Daltile, Marazzi, Florida Tile

Large-format porcelain (12x24, 24x24, 24x48) plus mosaic accents. Samples on-site before the order.

PEX supply + PVC drain

Modern plumbing that won't scale or corrode like 60-year-old galvanized. Permit-friendly with MA code.

Quartz counters: Cambria, Caesarstone, MSI Q

Non-porous, no sealing, built for moisture. Undermount sinks installed with proper silicone gaskets.

Worth knowing first

Things most contractors won't tell you.

Your joist bay matters

Heavy tile floors (big-format porcelain, especially stone) need a subfloor stiffer than code. We check deflection on day one and sister joists before tile goes down if needed. Skipping this step is why tile floors crack two winters later.

Waterproofing is not caulk

Caulk and grout fail within a few years. The waterproof layer under the tile is what actually keeps water out of your framing. We spec Schluter sheet membrane on every shower. No paint-on 'waterproofing', no mesh-tape-at-corners shortcuts.

Permits are worth pulling

For plumbing or electrical work in any Massachusetts town, a permit protects you — inspected work means clean disclosure when you sell, and known-good hidden infrastructure. We handle the paperwork.

Layout changes = big-time cost lever

Moving the toilet 8 inches means cutting into the subfloor and rerouting a 3-inch drain. We'll always tell you whether a layout change is worth the cost. Sometimes it is. Often it isn't.

What homeowners say

Reviews from bathroom remodel clients.

Their team gutted our 1970s hall bath and turned it into a spa. Zero-threshold shower, Schluter waterproofing, linear drain, perfect tile lines. They hit the schedule and stayed on budget.

Jennifer M.

Massachusetts · Full Remodel

Small hall bath felt three times larger when they finished. Floating vanity, 12x24 large-format tile up the wall, frameless glass. Quoted three, they came in on the low end.

Daniel K.

Massachusetts · Full Remodel

Hall bath remodel done while we were away. Came back to a finished room and a spotless house. They texted daily updates with photos.

Marie B.

Shrewsbury, MA · Full Remodel

Questions

Most-asked about bathroom remodel.

Most Massachusetts hall baths take 3–4 weeks demo-to-walkthrough. Master baths with plumbing relocations or custom tile run 4–6 weeks. We dedicate one crew to your project.

Yes. Commonwealth Bath Co. pulls the permit, schedules inspections, and submits the drawings. Your only role is approving the scope.

Yes, unless it's your only bathroom. We install dust containment, protect floors, and keep utility shutoffs to predictable windows you can plan around.

Very common on 1950s–1970s Massachusetts baths. Our contract includes an allowance for hidden conditions. If we find framing rot or mold, we show you the photos, explain the fix, and document the added cost before doing the work.

Design and material selection is included with every full remodel. We walk your bathroom, review inspiration images, and settle the layout, tile selections and fixture spec with you before anything is ordered.

Yes. All plumbing and electrical work is done by Massachusetts-licensed plumbers and electricians under permit, and it is covered by our lifetime workmanship warranty.

It depends on scope far more than finishes. A hall bath full gut-and-rebuild — PVC drain, PEX supply, Schluter waterproofing, tile, vanity, toilet, fixtures — typically runs $28,000–$45,000. A master bath with a walk-in shower, double vanity and heated floor typically runs $30,000–$95,000 or more, and relocating the toilet or tub adds subfloor work and a drain reroute on top. See our pricing guide for the full ranges. We break every line item out in writing before you sign.

Yes — if your project involves moving any plumbing (toilet, drain, supply lines), upgrading electrical (GFCI, new circuit for a heated floor or exhaust fan), or structural work (enlarging the bathroom, moving a wall). Massachusetts requires a registered Home Improvement Contractor and a building permit for these scopes. Cosmetic work — replacing a vanity in place, swapping fixtures without moving pipes, installing new tile over existing backer — can often be done without a permit. We tell you exactly which category your project falls in at the estimate appointment. We pull all permits ourselves.

Porcelain tile is the top choice for Massachusetts bathrooms because it's completely non-porous and unaffected by the seasonal humidity swings we get from June through September. Large-format porcelain (12×24 or 24×24) is especially popular right now — fewer grout lines, easier to clean, and reads upscale. For floors we use a slip-rated porcelain or textured mosaic to meet code. Natural stone (marble, travertine) is beautiful but needs sealing every 1–3 years in a shower environment. We install it with proper penetrating sealer and give you a maintenance schedule if you go that route. The non-negotiable for any Massachusetts bathroom: a properly sized humidity-sensing exhaust fan. Timers shut off too early and leave moisture in the walls. We spec humidity sensors on every project.

Ready when you are

Let's start your bathroom.

Free on-site estimate. Firm quote within 48 hours. No high pressure, ever.

520+

Projects Completed

5.0

24 Homeowner Reviews

1 day

Callback Window

Licensed & Insured Lifetime Warranty On-Time Finish

Get Your Free Bathroom Estimate

On-site quote, firm number, no high-pressure sales. Response within 1 business day.

No spam. No high pressure. We call once, answer your questions, schedule the on-site if you want.

Central Massachusetts

Full bathroom remodels, town by town

A full bathroom remodel in Massachusetts involves more than picking tile. Every town we work in has its own building department, permit fees and inspection schedule, and its own mix of housing that decides what we find behind the walls. We pull the permits and manage every inspection through final sign-off.

Bathroom remodel permits in Massachusetts

Any bathroom remodel in Massachusetts that involves moving plumbing, adding electrical circuits (heated floors, new exhaust fan wiring), or structural changes requires permits from the town building department. Cosmetic-only work — swapping a vanity in place, new tile over existing backer — typically does not. We assess permit requirements at your free on-site estimate and pull all permits ourselves. You never have to deal with the building department.

Guest / hall bath

Vanity, toilet, tile and fixtures in the same footprint. No plumbing relocation.

Full gut, same footprint

Down to studs. New supply and waste, Schluter waterproofing, full tile, permits.

Master bath

Walk-in shower, double vanity, heated floor, and layout changes where they earn their keep.

Looking for a complete overview of what it takes to do a bathroom remodel in Massachusetts — including permit details, cost breakdowns by scope, and the towns we cover? Our homepage covers everything homeowners need to know before starting a renovation.