
Full Bathroom Remodel
Full gut remodel in a 1926 Worcester two-family: cast-iron waste replaced with PVC, PEX supply, Schluter Kerdi shower, 12x24 porcelain floor. Lead-safe containment throughout.

Supplied, set and plumbed
Vanity, top, basin and valve replacement across Massachusetts — most jobs done in a single visit without disturbing the rest of the room.
On-site quote, firm number, no high-pressure sales. Response within 1 business day.
Licensed & Insured
MA Home & MA
NKBA Certified
Certified Bath Designer
4.9 / 5.0
214+ reviews
1180+ Bathrooms
Since 2013
Supplied, set and plumbed
A vanity swap is the highest-impact thing you can do to a bathroom without a full remodel. It changes the focal point of the room, updates the fixtures you touch every day, and takes a fraction of the time and budget of a gut.
The part people underestimate is the plumbing. Old supply valves seize, P-traps do not line up with a new cabinet's cutout, and a vanity that is a different height or depth exposes unfinished wall and floor. We handle all of that rather than leaving you with a gap and a note.
We supply and install, or install what you have already bought. Either way the old unit goes with us and the room is clean when we leave.
See all of our Massachusetts bathroom renovation services — from full gut remodels to accessible baths, tub-to-shower conversions, and master suite builds across Massachusetts.

What's included
Our Process
No mystery. No surprise delays. Here's the exact sequence.
We measure the rough-in, the supply and drain positions and the clearances so the unit you pick actually fits the room.
Old vanity, top and basin out. Valves shut, lines drained, everything wrapped and carried out.
New valves, new supplies, trap aligned, cabinet levelled and secured. Top set and sealed.
Faucet and drain assembly, caulk, wall patch where needed, leak test and cleanup.
Materials We Trust
We only install systems we can stand behind for twenty years. No brand bait-and-switch mid-job.

Quartz tops
The default for durability. Non-porous, no sealing, and it handles daily use better than natural stone.
Undermount basins
Nothing to catch on the counter edge when wiping down. Requires a top rated for undermount.
Wall-hung vanities
Needs solid blocking in the wall. We add it while the unit is off if it is not already there.
Quarter-turn shut-offs
We replace old multi-turn valves as standard. They are the thing that fails when you need them most.
Worth knowing first
A narrower or wall-hung vanity exposes unfinished wall and sometimes untiled floor. We price patching up front rather than discovering it on the day.
Shut-offs that have not moved in twenty years tend to weep once disturbed. We replace them as standard rather than gambling.
Two basins usually means a second drain and supply set. Whether that is simple depends entirely on what is behind the wall.
Older vanity areas frequently lack GFCI protection. If we are touching the circuit we bring it to current code.
Live Job Log
Real vanity installation projects finished in Massachusetts over the last few months.

Full Bathroom Remodel
Full gut remodel in a 1926 Worcester two-family: cast-iron waste replaced with PVC, PEX supply, Schluter Kerdi shower, 12x24 porcelain floor. Lead-safe containment throughout.

Tub to Shower Conversion
Tub-to-shower conversion in a Boston triple-decker: pulled cast-iron tub down three flights, rebuilt framing, Kerdi-Line linear drain, frameless glass.

Walk-In Shower Installation
Curbless walk-in shower in a Chelmsford ranch: zero-threshold pan, Kerdi-Board walls, bench seat, thermostatic valve, grab-bar blocking added.

Master Bathroom Renovation
Master bath remodel in a Lexington colonial: relocated supply for a freestanding tub, double quartz vanity, heated Ditra floor, Wellesley-style wainscot.

Full Bathroom Remodel
Hall bath gut in a Plymouth cape: rotted subfloor replaced, new rough-in, 24x48 large-format walls, building and plumbing permits pulled.

Accessible Bathroom Remodel
Accessible bath conversion in Andover: 36-inch doorway widened, curbless shower, fold-down bench, ADA grab bars, comfort-height toilet.

Shower Replacement
Shower replacement in a Springfield two-family: failed mud pan removed, Schluter Kerdi system, subway walls, mosaic floor, new mixing valve.

Bathtub Replacement
Bathtub replacement in a Reading colonial: cast-iron out, new alcove soaking tub, tiled surround, Schluter-Jolly edge profiles.
What homeowners say
48-inch shaker vanity, quartz top and new sconces. In and out in a day and the bathroom looks like a different room.
Ellen S.
Medford, MA · Vanity Installation
They replaced the shut-off valves without me asking, which the last plumber refused to touch. Small thing, big difference.
Paul D.
Norwood, MA · Vanity Installation
Double vanity in the master. They checked the rough-in first and told me exactly what the second drain would cost before starting.
Nina H.
Needham, MA · Vanity Installation
Questions
Most single-vanity swaps are done in one visit, typically half a day to a full day. Double vanities or jobs needing wall repair can run into a second day.
Generally no, if the plumbing stays in place. If supply or drain lines move, or a new circuit is run, Massachusetts requires the relevant permit. We will tell you which applies.
Yes, and that is common. Send us the model and we will confirm the rough-in works with your existing plumbing before the day.
We patch and finish the exposed wall and floor. On a significantly smaller unit that can mean tile work, which we quote up front.
Yes, if you want it done at the same time. Doing it in one visit is cheaper than bringing someone back.
Related services
Ready when you are
Free on-site estimate. Firm quote within 48 hours. No high pressure, ever.
1180+
Bathrooms Completed
4.9★
214 Google Reviews
1 day
Callback Window
On-site quote, firm number, no high-pressure sales. Response within 1 business day.